Recreation Building |
|
|
Outside front view of the building |
The Original look of the building.
(1997) |
After a face lift. (2000) |
|
Outside Side view of the building |
The Original look of the building.
(1997) |
After a face lift. (2000) |
|
Outside Back View of the building |
The Original look of the building.
(1997) |
After a face lift. |
|
Outside Rear view of the building. |
The Original look of the building.
(1997) |
After a face lift. |
Office/Camp Store |
|
|
Inside view of the Office area. |
The Original look of the Office. |
After a face lift #1. (1998) |
|
Face Lift #2 |
|
Inside view of the Office area. |
The Original look of the Office. |
After a face lift. |
|
Inside view of the Office area. |
The Original look of the Office. |
After a face lift. |
|
Inside view of the Office area. |
The Original look of the Office. |
After a face lift. |
Recreation Room |
|
|
Inside front view of the building |
The Original look of the Rec Room. |
After face lift #1 After facelift # 2 |
|
|
|
Inside Side view of the building |
The Original look of the Rec Room. |
After a face lift. |
|
|
|
Inside Front View of the building |
The Original look of the Rec Room. |
After a face lift #1. |
|
Inside Rear view of the building. |
The Original look of the Rec Room. |
After a face lift. |
Concession Area |
|
|
Inside front view of the building |
The Original look of the
Concession Area. |
During a repair to a leaking pipe
|
|
Inside Side view of the building |
The Original look of the
Concession Area. |
After a face lift. |
|
Inside Back View of the building |
The Original look of the
Concession Area. |
After a face lift. |
|
Inside Rear view of the building. |
The Original look of the
Concession Area. |
After a face lift. |
Recreation Room Ceiling |
|
||
Back in 1997 |
The Original look of the Ceiling. |
|
|
||
After a new Roof | ||
|
||
Insulation Installed | ||
|
||
Progress of the Inside Ceiling |
Start of installing carsiding |
|
|
||
Before |
During |
After |
2/14/12 |
||
Pre-staining the wood |
Getting the next
batch of wood laid out |
The pile is
shrinking.... 11/16/11 Have the main lights rewired (and working!) <Still have one light circuit to reroute> Next step in installing more 2x3 furring strips and raising the cross supports 4 ft. |
February 7, 2012 |
||
|
||